The Process / 01
Clean, repair, wrap, then coat. In that order.
A Tucson flat roof lives under some of the harshest sun in the country, and a good roof coating is what stands between that sun and your ceiling. Most coating failures we see were not caused by bad material. They were caused by coating rolled over dust, cracks, and ponding water.
So we do it in order. First a pressure scrub down to a clean surface. Then the repairs the inspection turned up. Seams and penetrations get wrapped with 40 inch polyester set in premium acrylic primer. Only then do we lay down two full coats of elastomeric, in white or tan.
- Pressure scrub and full surface preparation
- Seam and penetration wrap: 40 inch polyester with acrylic primer
- Two coat elastomeric and acrylic systems, white or tan
- 4 year warranty on the full residential system